000 | 01237nam a22001697a 4500 | ||
---|---|---|---|
005 | 20230915115304.0 | ||
008 | 230915b ph ||||| |||| 00| 0 eng d | ||
040 | _cAsian Technical Vocational Education Resource Center | ||
050 | _aVCD S55 U64tt 1984 | ||
245 |
_aShielded metal arc welding pipe: uphill: _btopic 12-19 |
||
260 |
_bHobart School of Welding Technology, _c1984 |
||
300 |
_a1 VCD: _bsd., col.; _c4 3/4 in. |
||
520 | _aTopic 12. Single v-groove, butt joint, 45 degrees fixed position (6G). -- Topic 13. Single v-groove, butt joint, 45 degrees fixed position (6G), guided bend test. -- Topic 14. Methods of applying the root pass. -- Topic 15. Single v-groove, butt joint, 45 degrees fixed position (6G), stainless steel pipe. -- Topic 16. Single v-groove, butt joint, 45 degrees fixed position (6G), stainless steel pipe, guided bend test. -- Topic 17. Preparation and assembly of a pipe joint, with backing ring. -- Topic 18. Single v-groove, butt joint, 45 degrees fixed position (6G), with backing ring. -- Topic 19. Single v-groove, butt joint, 45 degrees fixed position (6G), with backing ring, guided bend test. | ||
650 | _2Welding Steel & Fabrication Sector | ||
942 |
_2lcc _cELEC _n0 |
||
999 |
_c30075 _d30075 |